Tamper; Ferrite Bead Installation For The Act365-Vcupoe - Vanderbilt ACT365-VCU Installation And Operating Instructions Manual

Table of Contents

Advertisement

ACT365-VCU / ACT365-VCU2A / ACT365-VCUPoE – Installation and Operating Instructions
Battery charging will only start after a compliant PoE power source is connected to ACT365-VCUPoE, it
will not start up on battery. Ensure only a healthy 12V battery is fitted to the system.

2.3.4 Tamper

A tamper condition is reported in software.
1. Check that the tamper switch is:
Closed when the enclosure is mounted on the wall, lid is closed, and the lid screw is fitted.
l
Open when the lid is open.
l
2. Close cover and secure using fastening screw(s) provided.

2.3.5 Ferrite bead installation for the ACT365-VCUPoE

While installing the ACT365-VCUPoE, Vanderbilt recommend that you place the provided ferrite core (a
noise-suppression device) around the Ethernet cable to attain a desired level of electromagnetic
compatibility (EMC).
© Vanderbilt 2019
14
Installation
A-100528-b
20.05.2019

Advertisement

Table of Contents
loading

This manual is also suitable for:

Act365-vcu2aAct365-vcupoe

Table of Contents