Installation; Act365-Acu; Mounting; Power Supply - Vanderbilt ACT365-ACU Installation Instructions Manual

Table of Contents

Advertisement

2 Installation

The ACT365-ACU Controllers are for indoor installation only and must be installed as permanently
connected equipment.
An external mains disconnect device must be fitted. Before installation, ensure that the mains supply to
the controller is disconnected.
Mains power should be connected to ACT365 Controllers by a licensed electrician in accordance with
local/national codes.
After installing an ACT365 controller, Vanderbilt recommend that you place the provided ferrite bead (a
noise suppression device, supplied in a ziplock bag) around the Ethernet cable near the RJ45 connector to
attain a desired level of electromagnetic compatibility (EMC).

2.1 ACT365-ACU

2.1.1 Mounting

Mount the ACT365 Controller directly on to the wall with the supplied screws.
The keyed mounting hole should be screwed first to the wall to aid the mounting.
The unit should be installed in a ventilated area that allows for accessibility after installation.

2.1.2 Power supply

The ACT365-ACU requires an external 12V DC or 24V DC power supply. The supply should be connected
to the +12/24V DC and 0V/GND connections.

2.2 ACT365-ACU2A

This unit is only suitable for installation as permanently connected equipment.
The PSU is not suitable for external installation.
l
Equipment must be earthed.
l
Before installation, ensure that external disconnect device is OFF. The PSU should be installed via a 3A
fused spur according to all relevant safety regulations applicable to the application.
© Vanderbilt 2019
7
A-100521-c
15.03.2019

Advertisement

Table of Contents
loading

This manual is also suitable for:

Act365-acu2aAct365-acupoe

Table of Contents