Hardware Installation
3. Plug the screw terminal power connector into JP1 on the DeviceMaster UP by
aligning the scalloped sides.
4. Apply power to the DeviceMaster UP.
5. Verify that the network connection for the DeviceMaster UP is functioning
properly.
The LEDs are located between the RJ45 connector and the power terminal
block.
LED
When lit, the amber Status LED (D1) on the
DeviceMaster UP indicates the devices is fully powered
and has completed the boot cycle.
Status
Note: The Status LED flashes for approximately 15
When lit, the red Link/Act LED (D2) indicates a
Link/Act
working Ethernet connection.
When lit, the red Duplex (D3) LED indicates full-duplex
Duplex
activity.
When lit, the red 100 (D4) LED indicates a working 100
100
MB Ethernet connection (100 MB network, only).
6. Go to
Configuring the DeviceMaster UP
configure the network settings, and upload the appropriate protocol firmware
on the DeviceMaster UP.
Connecting the Power and Verifying Installation
Description
seconds while booting. When the bootloader
completes the cycle, the LED has a solid, steady
light.
on Page 19 to install PortVision,
DeviceMaster UP User Guide: 2000451 Rev. C - 15