Chapter 5
Connect the Field Computer (If Applicable)
Connect the CAN connector on the controller cable (P/N 115-0230-107) to the mating connection on the
1.
field computer.
Refer to the Installation & Operation Manual and the appropriate wiring schematic beginning on page 31 for
2.
installation and wiring instructions for the specific field computer being used.
Connect the Power Leads
Locate the power and ground leads on the power cable (P/N 115-0230-107).
1.
Disconnect the machine's connectors from the battery terminals.
2.
Install the BATT + power lead on the positive battery terminal and reinstall the machine's battery connector.
3.
Install the BATT - power lead on the negative battery terminal and reinstall the machine's battery connector.
4.
Route the spade terminal into the cab and connect it to a source of switched power.
5.
30
Hagie STS, Model Year 2007-2013 AutoBoom™ Installation Manual