Installing a Replacement Chassis in the Equipment Rack

Step 4
Disconnect the supplemental bonding and grounding connection from the chassis (see
and Grounding
Step 5
Remove the fan tray (see
Step 6
Disconnect RSP/RP cables connected to the console port, auxiliary port, or either of the management Ethernet
ports. Be sure to label each of the RSP/RP cables before you disconnect the cables.
Step 7
Disconnect any cables connected to the external alarm port on the alarm display.
Label each of the alarm display cables before you disconnect the cables.
Step 8
Disconnect the line card interface cables.
Step 9
Remove the RSP cards, RP cards, FCs, and LCs from the chassis (see
the Chassis, on page
Step 10
Remove the chassis air filter (see
Step 11
Remove the chassis from the rack.
a) Using the side handles to support the weight of the chassis, remove the screws that attach the chassis rack
mount flanges and the side rack mount brackets to the rack posts.
b) Carefully lift the chassis out of the rack and set it aside.
c) Use the rear handle on the Cisco ASR 9922 Router to push the chassis out of the rack and onto an adjacent
pallet jack for transport.
Installing a Replacement Chassis in the Equipment Rack
Follow these steps to install the replacement chassis and components in the equipment rack:
Procedure
Step 1
Install the new chassis in the rack (see
Step 2
Install the power modules (see
Step 3
Install the fan tray (see
Step 4
Install the RSP cards, RP cards, FCs, and LCs. (see
245).
Step 5
Install the chassis air filter (see
Step 6
Connect all line card and interface cables (see
Step 7
Connect the supplemental bonding and grounding connection (if there is one) to the chassis (see
Bonding and Grounding
Step 8
Connect power to the power trays on the rear of the chassis.
Step 9
To turn on power to the router, see
Cisco ASR 9000 Series Aggregation Services Router Hardware Installation Guide
264
Connections).
Removing and Replacing the Fan Trays, on page
245).
Replacing the Chassis Air Filter, on page
Rack-Mounting the Router
Removing and Replacing Power System Components, on page
Removing and Replacing the Fan Trays, on page
Replacing the Chassis Air Filter, on page
Connections).
Powering On the
Replacing Cisco ASR 9000 Series Router Components
Removing and Replacing Cards from
Chassis).
230).
Removing and Replacing Cards from the Chassis, on page
224).
Connecting Line Card Network Interface
Router.
Supplemental Bonding
230).
224).
232).
Cables).
Supplemental

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents