Installing A Replacement Chassis In The Equipment Rack; Packing A Chassis For Shipment - Cisco ASR 9001-S Hardware Installation Manual

Hide thumbs Also See for ASR 9001-S:
Table of Contents

Advertisement

Installing a Replacement Chassis in the Equipment Rack

Disconnect the power from the power modules on the front of the chassis:
Step 3
Disconnect the supplemental bonding and grounding connection from the chassis (see the
Step 4
"Supplemental Bonding and Grounding Connections" section on page
Disconnect RP cables connected to the console port, auxiliary port, or either of the management Ethernet
Step 5
ports.
Be sure to label each of the RP cables before you disconnect the cables.
Step 6
Disconnect the line card interface cables.
Remove the chassis from the rack.
Step 7
a.
b.
Installing a Replacement Chassis in the Equipment Rack
Use this procedure to install the replacement chassis and components in the equipment rack:
Step 1
Install the new chassis in the rack (see the
Step 2
Connect all line card and interface cables (see the
page
Step 3
Connect the supplemental bonding and grounding connection (if there is one) to the chassis (see the
"Supplemental Bonding and Grounding Connections" section on page
Connect power to the power modules on the front of the chassis.
Step 4
To turn on power to the router, see the
Step 5

Packing a Chassis for Shipment

Use the packaging that came with the replacement chassis to repack and ship the chassis being replaced.
Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide
5-6
Remove the screws that attach the chassis rack mount flanges and the side rack mount brackets to
the rack posts.
Carefully lift the chassis out of the rack and set it aside.
3-16).
Chapter 5
"Rack-Mounting the Router Chassis" section on page
"Connecting Route Processor Cables" section on
"Powering on the Router" section on page
Replacing Cisco ASR 9001 Router Components
2-7).
2-7).
3-21.
2-4).
OL-26701-02

Advertisement

Table of Contents
loading

Table of Contents