ABB PowerValue 11 RT G2 User Manual page 10

Hide thumbs Also See for PowerValue 11 RT G2:
Table of Contents

Advertisement

10
A B B U P S P R O D U C T S A N D S O L U T I O N S
1. Install the ear bracket onto the unit using the
3.2.3.2-1:
M4 flathead screws (figure 3.2.1-1).
Battery module
connection
2. Slide the unit into the rail kit and make sure to
tighten the rack-mounting screw
3.2.3.2-2:
(figure 3.2.1 -3).
Battery module
3. After installing the UPS into the rack, proceed
connection
with the connection of the load to the UPS.
Make sure the load devices are turned off
before plugging them into the output
receptacles.
3 .2 .3 .2 External battery modules
WARNING
Identify the final position and keep 2U spacing for
this installation; it is recommended that this
spacing is provided below the UPS.
1.
Install the ear bracket onto the unit with the
flathead M4 screw. (figure 3.2.1-1).
2.
Slide the unit into the rail kit and make sure
to tighten the rack-mounting screw
(figure 3.2.1-3).
3.
Connect the EBM to the UPS with the battery
power cable (figure 3.2.3.2-1).
4.
Install fixing plate to fix battery cable (figure
3.2.3.2-2)
3.2.3.2-1
3.2.3.2-2
DO NOT PILE UPS AND EBM ENCLOSURES,
THEY MIGHT FALL OVER. THE PICTURE
BELOW REPRESENTS JUST A SIMPLIFIED
CONNECTION DIAGRAM.
UP TO FOUR EXTERNAL BATTERY
ENCLOSURES CAN BE CONNECTED TO
THE UPS IN THE SAME WAY AS
SHOWN ABOVE.
NOTE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents