Charging The Rechargeable Battery Module - MSA G1 SCBA Operating Manual

Niosh cbrn/nfpa 2018 edition
Hide thumbs Also See for G1 SCBA:
Table of Contents

Advertisement

NOTICE
Do NOT use force to remove or install the battery module.
Do NOT attempt to open the housing of the rechargeable battery module. The rechargeable
battery module does not have replaceable cells.
Do NOT charge a rechargeable battery module in temperatures below 32°F (0°C) or above 104°F
(40°C).
Failure to obey these notices can result in damage to the battery and power modules.
NOTICE
Do NOT attempt to charge alkaline battery modules with the rechargeable battery charging station.
Failure to obey this notice can result in damage to the rechargeable battery charging station.
MSA recommends removing and charging the rechargeable battery module once a month during
normal use.
MSA recommends removing and charging the rechargeable battery module every 6 months if it has
not been in use or kept continuously in a charging station.

18.3.1 Charging the Rechargeable Battery Module

The battery module is installed on the user side of the SCBA in the middle of the backplate.
(1)
Put the charging station on a horizontal surface in an area with no dust and at a temperature
between 32°F – 104°F (0°C – 40°C). The ideal temperature is 70°F (21°C).
(2)
Connect the charging station to a 115 – 120 V, 50 or 60 Hz source (standard ac outlet).
NOTE: The charging station can be used internationally with the appropriate adapter up to 240 Vac.
(3)
Push the battery removal tool into the slot in the rechargeable
battery module until the tool clicks into position.
(4)
Pull the removal tool and the rechargeable battery module
out of the power module.
(5)
Make sure there is no water or debris on the rechargeable
battery module or the connectors on the charging station.
(6)
Install the rechargeable battery module in the charging
station.
(7)
Monitor the charging indicator.
G1 SCBA 2018 Edition
Maintenance
US
90

Advertisement

Table of Contents
loading

Table of Contents