3.3. Inspecting and Unpacking the UPS Cabinets

The UPS cabinet is heavy. If unpacking instructions are not closely followed, the cabinet may tip and cause serious
injury.
Do not stand directly in front of the pallet while unloading the cabinet. If unloading instructions are not closely
followed, the cabinet may cause serious injury.
1.
Carefully inspect the outer packaging for evidence of damage during transit.
Make a visual inspection and check that there are no signs of shipping damages. The 'Drop&Tell' indicator on the rear side of
the unit shall be intact if the equipment has been handled properly.
2.
Use a forklift or pallet jack to move the packaged cabinet to the installation site, or as close as possible, before
unpacking. If possible, move the cabinets using the pallet. Insert the forklift or pallet jack forks between the
supports on the bottom of the pallet.
For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the cabinet (see Table
cabinet weight).
Do not tilt the UPS cabinets more than 15° from vertical or the cabinets may tip over.
3.
Use a hammer to pry open the metal connection components around the wooden box, remove the wooden box,
cushioning materials and moisture-proof bag (Figure
4.
Remove the screws fixed the L-shaped parts around the cabinet and remove the L-shaped parts (Figure
reinstall the 8 screws removed before back to the cabinet feet. Please retain the shipping parts and fixing parts for
future use;
5.
Insert the fork into the bottom of cabinet from the side (Figure
To prevent damage to the wiring channel and wiring in the UPS cabinet base when lifting or moving the cabinet:
Lift and move the cabinet using only the front or rear forklift slots.
Verify that the forklift forks are in a horizontal position before inserting them into the forklift slots. DO NOT angle fork
tips upward.
Insert the forks all the way through the base. DO NOT insert forks partially into the base to move the cabinet.
Forks may be partially inserted into the front or rear forklift slots for minor positioning if the forks are kept in a
horizontal position with no upward angling.
DO NOT use the forklift slots on the end of the cabinet to move the cabinet.
End forklift slots may be used for minor positioning if the forks are kept in a horizontal position with no upward angling.
If these instructions are not followed, damage to the wiring channel and wiring will occur.
6.
Using the forklift, move the UPS cabinet to the final installed location.
7 .
User can remove the front and rear feet covers of the UPS cabinet, use the holes on the feet to install the UPS
cabinet on the ground or channel steel (see the bottom view in Figure 3-2 for hole dimensions), and then reinstall
the feet covers.
30
NOTE
NOTE
NOTE
NOTE
Eaton 93PR 500 kW UPS
User's and Installation Guide
3-4
~ Figure
3-6
);
3-8
)
3-2
for
3-7
),Please

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents