Doosan V158TI Operation & Maintenance Manual page 145

Hide thumbs Also See for V158TI:
Table of Contents

Advertisement

3) Inspection and adjustment
Assemble the nozzle in the nozzle tester and operate the nozzle tester 2 or 3 times to bleed air. After
pressurizing it measure the nozzle pressure.
New nozzle
Used nozzle
Re-check the injection pressure and see if the spray pattern is normal.
Adjust the injection pressure to the standard pressure using shims if the injection pressure is poor.
Nozzle opening pressure is adjusted by thickness of shims installed on the compress spring. There-
fore in case of low or high injection pressure, adjust by adding or reducing the spring tension adjusting
shims.
In case that atomizing state is not good it should be replaced.
After adjusting the injection pressure tighten the cap nut to specified torque.
Normal
Caution
As the fuel injection line is operated by high pressure, should pay particular attention to treat.
Fix the nozzle holder securely when assemble it.
Do not bend the injection pipe so much it as deformed severely.
Do not use the abnormal bending pipe preventing from cracking.
Do not bend the end portion of injection pipe over 2 or 3 degree to assemble it easily.
300 +8 kg/cm
2
2
285 +8 kg/cm
Abnormal
- 139 -
Abnormal
EFM1006I
Main parts maintenance

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V180tiV222tiAd158tiAd180tiAd222ti

Table of Contents