6
|
Unit installation
6 Unit installation
In this chapter
6.1 Preparing the installation site
6.1.1 Installation site requirements of the indoor unit
Installer reference guide
22
WARNING
Installation shall be done by an installer, the choice of materials and installation shall
comply with the applicable legislation. In Europe, EN378 is the applicable standard.
6.1
Preparing the installation site ................................................................................................................................................
6.1.1
6.2
Opening the unit.....................................................................................................................................................................
6.2.1
To remove the front panel.....................................................................................................................................
6.2.2
To open the service cover......................................................................................................................................
6.2.3
To remove the front grille......................................................................................................................................
6.2.4
6.3
Mounting the indoor unit.......................................................................................................................................................
6.3.1
To install the mounting plate.................................................................................................................................
6.3.2
To drill a wall hole ..................................................................................................................................................
6.3.3
To remove the pipe port cover ..............................................................................................................................
6.4
Connecting the drain piping ...................................................................................................................................................
6.4.1
General guidelines..................................................................................................................................................
6.4.2
6.4.3
6.4.4
To check for water leaks ........................................................................................................................................
Choose an installation location with sufficient space to transport the unit in and
out of the site.
Do NOT install the unit in places often used as work place. In case of construction
works (e.g. grinding works) where a lot of dust is created, the unit MUST be
covered.
WARNING
The appliance shall be stored so as to prevent mechanical damage and in a well-
ventilated room without continuously operating ignition sources (e.g. open flames,
an operating gas appliance, or an operating electric heater). The room size shall be as
specified in the General safety precaution.
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
INFORMATION
The sound pressure level is less than 70 dBA.
▪
Air flow. Make sure nothing blocks the air flow.
▪
Drainage. Make sure condensation water can be evacuated properly.
▪
Wall insulation. When conditions in the wall exceed 30°C and a relative humidity
of 80%, or when fresh air is inducted into the wall, then additional insulation is
required (minimum 10 mm thickness, polyethylene foam).
7].
22
22
23
23
24
24
25
26
26
27
27
28
28
29
29
30
"2 General safety
CTXM-A, FTXM-A, ATXM-A
Daikin room air conditioner
4P518023-17P - 2023.06