A.4.2

SS1-t acceptance test

Table A- 5
Procedure for the SS1-t acceptance test
1.
The inverter is ready for operation
The inverter signals neither faults nor alarms.
STO is not active (r0002 ≠ 44).
(e.g. R0002 = [31] Ready for switching on – set "ON/OFF1" = "1/0" (p0840)
2.
Switch on the motor
2.1.
Enter a speed setpoint ≠ 0.
2.2.
Switch on the motor (ON command).
2.3.
Check that the correct motor is running.
2.4.
Check the status of the safety relay LEDs
(here in the example, a 3SK1112-... or 3SK112x-...)
LED (1) DEVICE = green
LED (2) OUT = green-> 3SK1 output circuit closed
LED (3) IN = green-> 3SK1 switch-on (close) conditions satisfied
Input circuit closed
Feedback circuit closed
Start button where necessary actuated
LED (4) SF = OFF
Power Module PM330
Hardware Installation Manual, 12/2018, A5E32844552B AF
A.4 Acceptance test/configuration test
Appendix
Status
137