Appendix: The First Commissioning of AS-i
What to do ?
How to go about it?
The configuration of the AS-i master is now finished.
Now the hierarchically higher fieldbus system can be put into operation.
The gateway stays in the off-line phase (the display shows "40", the LED
"config err" lights up), until the hierarchically higher fieldbus system
operates properly.