Download Print this page

Kinroad 150 Service Manual page 37

Advertisement

KINROAD 150 SERVICE MANUAL
AIR CUT VALVE REMOVAL
Remove the air inlet manifold of the air cut valve.
Remove the bolt, and remove the vacuum membrane cover,
the spring, and the vacuum membrane.
AIR CUT VALVE INSTALLATION
Assemble the vacuum membrane on the carburetor bolt.
Assemble the spring, the vacuum member cover, and the lock
bolt.
The bottom side of the vacuum membrane
should be aligned with the carburetor, and
the topside should be aligned with the
vacuum membrane.
AIR CHECK VALVE
The air check valve starts working under 50km/h, and impel the second air inlet to burn, and reduce CO
displacement.
AIR CHECK VALVE INSTALLATION
Reverse the procedure for removal.
When installing, make sure every connecting pipes are connected properly, and
they cannot be squeezed, bent, or clogged up.
TRANSMISSION COMPONENTS INSPECTION AND SERVICING
STARTING MECHANISM INSPECTION AND SERVICING
The starting mechanism can be divided into two types: kick starting and electric starting.
SPIRAL
SPLINE
MECHANISM REMOVAL
Remove the left crankcase cover.
Remove the crankcase gasket, dowel pins.
Remove the movable driving plate (the whole set).
Remove the starting spindle washer.
TRANSFERRING
STYLE
STARTING
38
VERSION 1, DEC., 2005

Advertisement

loading

Related Products for Kinroad 150