Connect The Harness Cable To The Implement Extension Tee - Gen Ii Cable Only; Connect The Harness Cable To The Controller Cable - Gen I Cable Only; Connect The Controller (If Applicable) - Gen I Cable Only; Connect The Field Computer (If Applicable) - Raven AutoBoom Installation Manual

For case ih 3200; case ih 3200b
Hide thumbs Also See for AutoBoom:
Table of Contents

Advertisement

Chapter 4
Locate the Right Outer Sensor connector on the AutoBoom harness cable.
5.
Connect the Right Outer Sensor connector to the installed right sensor cable.
6.
If optional inside boom sensors are installed, repeat the steps above to connect the inner sensors.
7.
Connect the Harness Cable to the Implement Extension Tee -
Gen II Cable Only
Route the harness cable (P/N 115-0230-085) toward the implement extension tee cable.
1.
Connect the harness cable to the To Node connector.
2.
Remove the terminator from the machine's chassis harness or the standalone console harness.
3.
Install the terminator on the remaining open end of the implement extension tee cable.
4.
Refer to the wiring schematic (beginning on page 49) appropriate for the machine's configuration to route
5.
the implement extension tee cable.
Connect the implement extension tee cable to the location determined in the step above.
6.
Connect the Harness Cable to the Controller Cable - Gen I
Cable Only
Route the harness cable (P/N 115-0230-045) toward the machine's cab.
1.
Connect the harness cable to the controller cable (P/N 115-0230-007).
2.
Tighten the connector screw cap to secure the connection.
3.

Connect the Controller (If Applicable) - Gen I Cable Only

Route the controller cable (P/N 115-0230-007) into the right side of the machine's cab.
1.
Locate the two controller connectors and connect them to the AutoBoom controller (P/N 063-0130-021).
2.
Note:
The AutoBoom controller should be mounted in the machine's cab so that the machine's operator
has easy access to it.

Connect the Field Computer (If Applicable)

Refer to the Installation & Operation Manual and the appropriate wiring schematic beginning on page 49 for
installation and wiring instructions for your specific field computer.

Connect the Power Leads

Locate the power cable that has the red and white power leads at one end.
1.
Disconnect the machine's connectors from the battery terminals.
2.
Install the red power lead on the positive battery terminal and reinstall the machine's battery connector.
3.
Install the white power lead on the negative battery terminal and reinstall the machine's battery connector.
4.
48
CaseIH SPX 3200/3200B (2002 & Newer, S/N 3805+) AutoBoom Installation Manual

Advertisement

Table of Contents
loading

Table of Contents