Spf-20A Installation; Installation Of Infeed Conveyor Section (Spf-Cv) - Horizon Fitness SPF-20A Manual

Stitcher & folder
Table of Contents

Advertisement

6. Move and Installation

6-3 SPF-20A Installation

6-3-1 Installation of Infeed Conveyor Section (SPF-CV)

To connect the SPF-20A with a collator
directly, install the infeed conveyor section
(SPF-CV) to the SPF-20A.
Infeed Conveyor Section Installing Kit
Infeed Conveyor
Positioning pin
1.
Install the infeed conveyor section to the
SPF-20A.
(1) Install the positioning pins. (on the front
and rear sides)
(2) Remove the six locking screws.
(3) Remove the front and rear covers of the
infeed conveyor section.
NOTE
- Stack booklets or sheets of 320 mm (12.6")
height on the floor and place the infeed
conveyor section on the sheets. The conveyor
can be handled easily.
(4) Put the infeed conveyor section on the
positioning pins and lock with the locking
screws removed in step (2). (Three screws
each on the front and rear sides).
1 pc
Flat Belt
2 pcs
Connecting Plate
*To connect the SPF-20A with the HOF-30/-20 or
ST-40, see section 6-2-2 and install the entrance
cover.
1 pc
1 pc
Infeed Conveyor
Section
Booklets
(Sheets)
(about 320 mm
[12.6"])
92
Safety Cover
Infeed Conveyor
Locking Screws
Positioning Pin
1 pc

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents