6-2 SPF-20A Move

This section shows how to move SPF-20A.
WARNING
- SPF-20A weighs 490 kg (1080 lb).
Move SPF-20A with a suitable method.
- Install SPF-20A on the flat and rigid
floor.
1.
Remove stack plate and connector, and
then remove delivery conveyor.
2.
Remove two SPF-20A connectors to
collator.
3.
Remove connecting plate.
4.
When FC-20A is combined, remove FC-
20A connectors to SPF-20A.
5.
Loosen 3 leveling bolts and remove 3
mounts.
Stack Plate
01SPF20AA81
Delivery Conveyor
Connecting Plate
FC-20A
Connectors
Leveling Bolt (3 pcs)
Mount (3 pcs)
91
6. Move and Installation
Connector
Collator
Connectors
SPF-20A