Chapter 4: Maintenance; Service And Inspection Schedule - Aerotech ANT130LZS Series Hardware Manual

Hide thumbs Also See for ANT130LZS Series:
Table of Contents

Advertisement

ANT130LZS Hardware Manual

Chapter 4: Maintenance

N O T E : The bearing area must be kept free of foreign matter and moisture; otherwise, the performance
and life expectancy of the stage will be reduced.
D A N G E R : To minimize the possibility of bodily injury or death, disconnect all electrical
power prior to performing any maintenance or making adjustments to the equipment.

4.1. Service and Inspection Schedule

Inspect the ANT130LZS once per month. A longer or shorter inspection interval may be required depending
on the specific application, and conditions such as the duty cycle, speed, and environment.
Monthly inspections should include but not be limited to:
Visually inspect the stage and cables.
l
Re-tighten loose connectors.
l
Replace or repair damaged cables.
l
Clean the ANT130LZS and any components and cables as needed.
l
Repair any damage before operating the ANT130LZS.
l
Inspect and perform an operational check on all safeguards and protective devices.
l
www.aerotech.com
Chapter 4
Maintenance
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ant130lzs-060Ant130lzs-035Ant130lzs-160Ant130lzs-110

Table of Contents