YASKAWA YASNAC i80 Maintenance Manual page 193

For machine tools
Table of Contents

Advertisement

(c) Insert all modules in line with the guide of the
NC rack and tighten mounting screws (NC rack).
(d)
the cables into the original positions.
insert all
(3)
Checking Functions After Replacement
(a)
Check that+ 5V, + 12V, and + 24V outputs are not
shorted due to overloading.
(b) Apply the first power and second power again and
check that no alarm occurs.
provided with CMOS RAM (programs, parameters and
offset data) and with backup by super capacitor.
Therefore, installation must be completed within
16 hours after removal of the boards.
183

Advertisement

Table of Contents
loading

Table of Contents