Cabinet B, Backbox Installation - Honeywell Gamewell-FCI E3 Series Installation & Operation Manual

Expandable emergency evacuation system
Hide thumbs Also See for Gamewell-FCI E3 Series:
Table of Contents

Advertisement

Cabinets

2.5.6.1 Cabinet B, Backbox Installation

1.
Prepare the mounting site by pre-drilling four (4), #10 screws, using the dimensions shown in
figure below. Use four (4), #10 screws.
NOTE: If the fasteners are anchored to wallboard, use #10 wall anchors. Mountings to concrete
walls should be backed by plywood to insulate the equipment from possible condensation.
2.
Secure with two (2), #10 screws in the two-hole mounting pattern as shown in Locations 1 and
2 of the figure below.
3.
Set the backbox over the top, two-hole mounting pattern, and hang the backbox over the two
screw heads.
4.
Insert and secure two (2), #10 screws in the two-hole mounting pattern as shown in Locations
3 and 4 of the figure below.
NOTE: Add knockouts to the left and right side of the rear panel of the backbox. Do not add
knockouts in the center or top of the backbox, above the ILI-MB-E3/ILI95-MB-E3, behind or below
the batteries. To add larger knockouts, increase the size of the existing knockouts.
1.25"
4.50"
1.35"
16.69"
E3 Series Installation/Operation Manual — P/N 9000-0574:I 11/04/10
BACKBOX TOP
1.50"
BACKBOX
3.38"
.25"
.50"
1
3
Figure 2.5.6.1.1 Cabinet B, Backbox Installation
16.38"
19.38"
16.00"
2
4
Installation
BACKBOX DEPTH = 4.50"
BACKBOX
SIDE PANEL
1.50"
2.25"
8.00"
19 3/8"
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents