E3Bb-Flush-Lcd, Cab A2, Remote Flush Annunciator To The Backbox Installation - Honeywell Gamewell-FCI E3 Series Installation & Operation Manual

Expandable emergency evacuation system
Hide thumbs Also See for Gamewell-FCI E3 Series:
Table of Contents

Advertisement

Installation
2.5.3.2 E3BB-FLUSH-LCD, CAB A2, Remote Flush Annunciator to the
Backbox Installation
1.
Mount the keyswitch to the E3BB-FLUSH-LCD Flush Mount Front Cover and secure with
one (1), nut (3/4-24 THD Hex) as shown in Location 1 of Figure 2.5.3.2.1.
2.
Attach the keyswitch cable to the key as shown in Location 2 of Figure 2.5.3.2.1.
3.
Mount the LCD-E3 keypad to the E3BB-FLUSH-LCD Flush Mount Front Cover and secure
with eight (8), nuts (#6-32, Hex Keps) in the eight-hole mounting pattern as shown in Location
3 of Figure 2.5.3.2.1.
4.
Plug-in the P2 keyswitch cable to the W2 terminal on the LCD-E3 display panel as shown in
Location 4 of Figure 2.5.3.2.1.
(For information on the location of the P2 and W2 terminal on the LCD-E3 panel, refer to
Note 1 on the LCD-E3 Wiring Diagram in Figure 3.13.4.1 of Section 3.14.4).
5.
To connect the LCD-E3 panel wiring on TB1, refer to TB1 in Figure 3.13.4.1 (LCD-E3 Wiring
Diagram) in Section 3.14.4.
6.
Attach the E3BB-FLUSH-LCD Flush Mount Front Cover to the Backbox and secure with
eight (8), screws (#6-32 x 3/8" PHBHD, BLK) in the eight-hole mounting pattern as shown in
Location 5 of Figure 2.5.3.2.1.
S C R E W ,
(# 6-32 x 3 /8")
B H B H D , B L K
(8 P L A C E S )
Figure 2.5.3.2.1 E3BB-FLUSH-LCD, CAB A2, Remote Flush Annunciator Backbox
34
L C D -E 3
5
3
5
3
5
1
5
K E Y S W IT C H
E3 Series Installation/Operation Manual — P/N 9000-0574:I 11/04/10
B A C K B O X
5
3
3
4
P 2 , K E Y S W IT C H
2
C A B L E (2 IN R T .
A N G L E H E A D E R )
1
K E Y S W IT C H
C A B L E
N U T ,
T H D H E X
Installation
Cabinets
5
5
5
N U T , (# 6-32) H E X
K E P S (8 P L A C E S )

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents