Assembly And Installation Information - Honeywell MA-2000 Installation Manual

Hide thumbs Also See for MA-2000:
Table of Contents

Advertisement

MA-2000
4

ASSEMBLY AND INSTALLATION INFORMATION

The function of the FACP depends on the country-specific version of the operating system software used for the
panel and the customer data programming.
Installation and commissioning must only be carried out by a qualified electrician!
The fire alarm control panel may only be installed in dry, clean, and adequately illuminated areas with
restricted access.
The FACP must be mounted to an even mounting surface using suitable mounting material
(screws + anchors) and without creating any mechanical tension. The FACP may be operated only when it
has been properly mounted to a wall or mounting surface of sufficient load-bearing capacity.
Strong electrical / electromagnetic and mechanical influences must be avoided. This applies particularly to
the installation of the FACP, components and installation cables in the direct vicinity of fluorescent lamps
or energy cables and if mounted on vibrating, unstable surfaces such as thin partition walls.
To ensure the product safety, only approved cables in accordance to the IEC 60332-1-2 and IEC 60332-1-3
or IEC/TS 60695-11-21 standard must be lead into the devices housing.
The used cable glands must comply to the flammability rating V-1 or above.
The system may not be installed in facilities and environments that have harmful effects.
For wall installation, operating modules and visual displays should be installed between 800 mm and
1800 mm above the place where the operator stands.
Danger – Electrical shock !
Remove all power from the FACP before carrying out any installation work!
Fuses
The device fuses cannot prevent an unexpected malfunction in electrical assemblies, rather
these fuses should protect the user and his environment from damage. Therefore, never repair,
bypass or replace the factory-installed fuses with a type other than the one specified!
Energy and Backup power supply
For service and maintenance work on the backup power supply of the FACP, it is imperative to
observe the information and notes in this documentation!
Protective and functional earth
The PE conductor must be connected to the corresponding terminal at the mains supply.
Connect the FE terminal of the panel's cabinet with the protective earthing rail (PE rail) of the
power distributor panel from which the fire alarm system will be powered.
Configuration and Commissioning
For commissioning and configuration of the system always use software in its current version!
A complete system check must be carried out after commissioning and for each modification of
the customer data programming!
10
M-167.1-MA2000-EN / 06.2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

Morley-ias ma-8000

Table of Contents