Nice 7251 Installation And Programming Manual page 13

Vehicular pad or post-mount slide gate operator with 1050 control board
Hide thumbs Also See for 7251:
Table of Contents

Advertisement

2A
7251: MOUNT CHAIN BRACKETS TO GATE FRAME
1. Put the gate in the center of travel of the opening (IMAGE 2A-1). The gate should remain in this
position while the chain is attached to the operator.
IMAGE 2A-1: GATE IN CENTER TRAVEL POSITION (PART WAY OPEN)
2. Mount chain brackets (IMAGE 2A-2) to gate frame at either end of gate (IMAGE 2A-3), either by using
the four supplied 2" U-Bolts and hardware or by tack welding in place.
www.ApolloGateOpeners.com | (800) 878-7829 | Sales@ApolloGateOpeners.com
7251 / 7351 Slide Gate Operator
INSTALLATION AND PROGRAMMING MANUAL
IMAGE 2A-2: CHAIN BRACKET AND HARDWARE
CHAIN BRACKET
AT LEFT SIDE
OF GATE
CHAIN
CHAIN
BRACKET
IMAGE 2A-3: CHAIN BRACKETS INSTALLED ONTO GATE
CHAIN BRACKET
AT RIGHT SIDE
TOP VIEW
GATE
CONTROL
BOX
OF GATE
CHAIN
BRACKET
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7351

Table of Contents