This Is How You Install The Pp 72/48D Pn - Siemens SINUMERIK 828D Series Software And Hardware Service Manual

Hide thumbs Also See for SINUMERIK 828D Series:
Table of Contents

Advertisement

11.To remove the I/O module, release the fixing screws.
12.Note down the address set with DIP switch S1 on the defective module.
4.6.3

This is how you install the PP 72/48D PN

Installing
Procedure:
1. Set DIP switch S1 of the new module as you previously noted down.
2. Install the new I/O module.
3. Connect the ground connection.
4. Connect the communication cables at interface X2 (port 1 and port 2).
5. Re-establish the strain relief for the communication cables.
6. Re-insert the connectors of the ribbon cables (X111, X222, X333) on the module that are
used to connect the digital inputs and outputs.
7. Reconnect power supply X1.
8. Close the cabinet and switch-on the system again.
DIP switch S1
Setting of switch S1:
1
ON
OFF OFF OFF ON
ON
OFF ON
ON
The switch positions 9 and 10 guarantee the PROFINET functionality of the module and must always be
switched "ON".
Note
A new address only becomes effective after voltage OFF → ON.
Software and hardware
Service Manual, 08/2018, 6FC5397-5DP40-6BA1
2
3
4
5
OFF OFF ON
OFF OFF OFF OFF
OFF OFF OFF OFF
ON
ON
OFF OFF OFF OFF OFF
ON
OFF OFF OFF OFF OFF
OFF ON
OFF OFF OFF OFF OFF
6
7
8
9
ON
Service cases - hardware
10
Device name
ON
pp72x48pn9
pp72x48pn8
pp72x48pn7
pp72x48pn6
pp72x48pn5
4.6 I/O modules
113

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 828d ppu 27.4 seriesSinumerik 828d ppu 290.4

Table of Contents