RF Flange Installation (MT100S, MT100M)
The flange mount flow element is shown in Figure 8 and Figure 9 below. Attach the process mating flange with care. The correct
orientation of the flow element must be maintained to ensure the calibrated accuracy.
Verify the process media flow matches the flow direction arrow on the flow element.
Apply appropriate gasket and/or sealant to flange mount as required.
Mate flow element flange to process flange keeping reference flat oriented properly.
Secure flanges with appropriate mounting hardware.
Note:
Note:
Fluid Components International LLC
Mounting gaskets and hardware (nuts and bolts) shall meet the requirements of ASME B16.5. The bolt torque shall
meet the gasket specification requirements.
Depending on the application/length, some flanged multisensor probes will require additional end support hardware.
See
Figure 10
and
Figure 11
Figure 8 – Single Point, Fixed RF Flange Process Connection
on page 15.
INSTALLATION
Ø 1
13

Advertisement

Table of Contents
loading

Table of Contents