Adjustments - Market Forge Industries ECO-TECH PLUS ETP-10E Installation & Operation Manual

Electric convection steamer
Table of Contents

Advertisement

INSTALLATION, OPERATION MANUAL, MODEL ETP-10E

8.0 ADJUSTMENTS

WARNING: At least twice a year, have an authorized service person
clean and adjust the unit for maximum performance.
ADJUSTMENT FOR HIGH ALTITUDE LOCATIONS
The steamer has been factory set so that when it is ON, and during the READY phase, it will
maintain water temperature in the steam generator tank at approximately 200 F (93 C) (just
below water boiling point). However, for high altitude locations, an authorized service agency
must adjust the steamer to achieve this temperature.
CAUTION: Shut off main electrical power to unit.
Door Gasket Replacement
The cooking compartment door gaskets are made of a silicone-type rubber material that is very
durable but subject to wear during normal operation. Should the gasket leak replace it.
1. Open the cooking compartment door.
2. Remove the four screws on the outside of the door frame, and remove the door panel
assembly.
3. Remove the six screws from the gasket plate in the door panel assembly.
4. Remove the gasket plate and the door gasket from door panel.
5. Install the new door gasket to the door panel. Replace the gasket plate and six screws.
6. Reassemble the door panel assembly in the door frame using the four screws.
7. Gasket replacement is now complete.
Door may be difficult to close until gasket has compressed to conform to opening. Leaving
door closed overnight will compress gasket.
Part No. 10309R0
30
2019-05-14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents