FORM 160.75-O1 (211)
In complying with Johnson Controls' policy for contin-
uous product improvement, the information contained
in this document is subject to change without notice.
While Johnson Controls makes no commitment to up-
date or provide current information automatically to
the manual owner, that information, if applicable, can
be obtained by contacting the nearest Johnson Controls
Service office.
Variable Speed Drive – Operation
Solid State Starter – Operation and Maintenance
Floor Mounted MV SSS – Operation
Unit Mounted MV SSS – Operation
Installation – Unit
Optiview™ Control Center – Operation and Maintenance
Wiring Diagram – Field Connections for YK Chiller (Style G) OptiView Control Center with Remote Low
or Medium Voltage EMS or Unit Mounted Low or Medium Voltage SSS
Wiring Diagram – Field Connections for YK Chiller (Style G) OptiView Control Center with Remote
Medium Voltage SSS
Wiring Diagram – Field Connections for YK Chiller (Style G) OptiView Control Center with Remote
Medium Voltage VSD
Wiring Diagram – Field Control Modifications for YK Chiller (Style G)
Wiring Diagram – YK Chiller (Style G) OptiView Control Center with Remote Low or Medium Voltage EMS
Wiring Diagram – YK Chiller (Style G) OptiView Control Center with Unit Mounted Low or Medium
Voltage SSS, Unit Mounted Low Voltage VSD with Modbus, or Remote Medium Voltage VSD
Wiring Diagram – YK Chiller (Style G) OptiView Control Center with LTC I/O Board with Remote Low or
Medium Voltage EMS
Wiring Diagram – YK Chiller (Style G) OptiView Control Center w/ LTC I/O Board with Unit Mounted Low
or Medium Voltage SSS, Unit Mounted Low Voltage VSD with Modbus or Remote Medium Voltage VSD
Renewal Parts – Unit
Renewal Parts – OptiView Control Center
JOHNSON CONTROLS
CHANGEABILITY OF THIS DOCUMENT
ASSOCIATED LITERATURE
MANUAL DESCRIPTION
Operating/service personnel maintains the responsi-
bility of the applicability of these documents to the
competitive equipment the kit is installed on. If there
is any question regarding the applicability of these
documents, the technician should verify whether the
equipment has been modified and if current literature
is available with the owner of the equipment prior to
performing any work on the chiller.
FORM NUMBER
160.00-O1
160.00-O2
160.00-O5
160.00-O7
160.75-N1
160.54-O1
160.75-PW1
160.75-PW2
160.75-PW3
160.75-PW4
160.75-PW5
160.75-PW6
160.75-PW7
160.75-PW8
160.75-RP1
160.54-RP1
3
Need help?
Do you have a question about the YORK YK Style G OPTIVIEW and is the answer not in the manual?
Questions and answers