Johnson Controls YORK YK Style G OPTIVIEW Operation And Maintenance page 291

Centrifugal liquid chillers, r-134a, with control center for electro-mechanical starter, solid state starter and variable speed drive
Table of Contents

Advertisement

FORM 160.75-N1
ISSUE DATE: 4/30/2014
EVAPORATORS – COMPACT WATERBOXES – A THRU L EVAPORATORS - FT - IN (MM)
EVAP.
A
AA
C
M
COMPRESSOR END
FLOOR LINE
EVAP.
B
C
DD
BB
C
M
FLOOR LINE
COMPRESSOR END
EVAP.
F
G
DD
BB
C
M
FLOOR LINE
COMPRESSOR END
NOZZLE PIPE SIZE IN (MM)
CONDENSER
NUMBER OF PASSES
SHELL CODE
1
8"
A
(203)
10"
C,D
(254)
14"
E,F
(355)
14"
G,H
(355)
16"
I,J,K,L
(406)
NOTES:
1. Standard water nozzles are furnished as welding stub-outs with grooves, allowing the option of welding, flanges, or use of Victaulic
couplings. Factory-installed, class 150 (ANSI B16.5, round slip-on, forged carbon steel with 1/16" raised face), water flanged nozzles are
optional (add 1/2" to nozzle length). Companion flanges, nuts, bolts, and gaskets are not furnished.
2. One-, two- and three-pass nozzle arrangements are available only in pairs shown and for all shell codes. Any pair of evaporator nozzles
may be used in combination with any pair of condenser nozzles.
3. Evaporator and condenser water must enter the waterbox through the bottom connection to achieve rated performance.
4. Connected piping should allow for removal of compact waterboxes for tube access and cleaning.
5. Add dimension "M" as shown on the unit dimensions page for the appropriate isolator type.
6. Standard 150 PSI design pressure boxes shown.
FIGURE 19 - DIMENSIONS – EVAPORATOR COMPACT WATERBOXES A THRU L EVAPORATORS
JOHNSON CONTROLS
FRONT
OF
UNIT
EVAP.
H
C
M
MOTOR END
FRONT
OF
EVAP.
UNIT
J
K
BB
C
MOTOR END
FRONT
OF
EVAP.
UNIT
N
P
C
MOTOR END
COMPACT WATERBOXES – 150 PSI ROUND
2
3
6"
4"
1'-3 1/2"
(152)
(101)
(394)
8"
6"
1'-5 1/2"
(203)
(152)
(445)
10"
8"
1'-7"
(254)
(203)
(483)
10"
8"
2'-0"
(254)
(203)
(610)
12"
10"
2'-1 1/4"
(305)
(254)
(641)
NUMBER OF
AA
PASSES
DD
NUMBER OF
PASSES
M
DD
NUMBER OF
BB
PASSES
M
EVAPORATOR NOZZLE DIMENSIONS FT-IN (MM)
1-PASS
2-PASS
C
AA
BB
5
5
1'-10"
1'-2"
(559)
(356)
2'-0"
1'-3"
(610)
(381)
2'-2"
1'-4"
(660)
(406)
2'-3 1/2"
1'-3 1/2"
(699)
(394)
2'-6"
1'-5"
(762)
(432)
SECTION 2 - INSTALLATION
NOZZLE
ARRANGEMENTS
EVAPORATOR
IN
OUT
A
H
1
H
A
NOZZLE
ARRANGEMENTS
EVAPORATOR
IN
OUT
C
B
2
K
J
NOZZLE
ARRANGEMENTS
EVAPORATOR
IN
OUT
G
N
3
P
F
3-PASS
DD
BB
DD
5
5
2'-6"
1'-2"
2'-6"
(762)
(356)
(762)
2'-9"
1'-3"
2'-9"
(838)
(381)
(838)
3'-0"
1'-4"
3'-0"
(914)
(406)
(914)
3'-3 1/2"
1'-3 1/2"
3'-3 1/2"
(1,003)
(394)
(1,003)
3'-7"
1'-5"
3'-7"
(1092)
(432)
(432)
2
LD07598a
5
31

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the YORK YK Style G OPTIVIEW and is the answer not in the manual?

Table of Contents

Save PDF