Control And Signal Wiring; Sync Cable; Precharge Board - Allen-Bradley 1336 REGEN Series User Manual

Line regeneration package
Table of Contents

Advertisement

Control and Signal Wiring

Sync Cable

The sync cable that is shipped with the
1336 REGEN Precharge unit connects
the required startup, diagnostic and
control signals between the 1336
REGEN Converter Control Board and
the 1336 REGEN Precharge Board. The
ribbon cable shield provided at the
converter end must be connected to the
Control Board Shield Connector J14 as
shown in Figure 2.13 to maintain signal
integrity.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Regenerative DC Bus Supply Operation
1336 REGEN
Precharge-to-Converter
Sync Cable Installation

Precharge Board

Connector J1
Sync Cable Length
2 Meters
or
4 Meters
Control Board
Connector J13
Control Board
Connector J14
Important: The Precharge-to-Converter
Sync Cable shipped with the 1336 REGEN
Precharge Unit must be connected between
the Precharge Board in the Precharge Unit
and the Control Board in the 1336R
Converter for 1336 REGEN Line Regen
Package operation.
2–15
1336 REGEN
PRECHARGE
UNIT
R1
S1
T1
T2
R2
S2
1321 10% LINE REACTOR
S
t o p p e d
. 0 0 H z
+
0
1336 REGEN
CONVERTER