Allow The Analyzer To Warm Up; Review The Principles Of Connector Care - Keysight Technologies M937 A PXIe Series Service Manual

Vector network analyzer modules, 300 khz to 4/6.5/9/14/20/26.5 ghz
Hide thumbs Also See for M937 A PXIe Series:
Table of Contents

Advertisement

Tests, Adjustments, and Troubleshooting
Before You Begin

Allow the Analyzer to Warm Up

To achieve the maximum system stability, allow the network analyzer to
warm up for at least 15 minutes.

Review the Principles of Connector Care

For online information on connector care, go to
http://na.support.keysight.com/pna/connectorcare/Connector_Care.htm.
2-6
Keysight M937xA PXIe Service Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

M9374aM9370aM9375aM9371aM9372aM9373a

Table of Contents