Good Workshop Practices
Attire/Dress
Always wear clean uniform
Wear safety shoes
Wear gloves, when required
Wear belt cover
Vehicle Protection
Put seat cover, fender cover, steering wheel cover, before starting the operations.
Safety
When working with 2 or more persons, be sure to check safety for one another
When working with engine running, make sure to provide ventilation for exhaust fumes in the
workshop
If working on high temperature, high pressure, rotating, moving, or vibrating parts, wear
appropriate safety gear and take extra care not to injure yourself or others.
When jacking up the vehicle, be sure to support the specified location with a safety stand.
When lifting up the vehicle, use appropriate safety equipment.
Parts and tools
Before starting operation, prepare tool stand, MST, Gauges, oils and parts for replacement.
Removed Parts
Place removed parts in a separate box to avoid mixing them up with new parts or contaminating
new parts.
For non-reusable parts such as gaskets, O-rings, and self-locking nuts, replace them with new
ones as instructed in the manual
Retain the removed parts for customer inspection, if requested.
IMPORTANT
Mahindra Xylo mEagle is fitted with LSPV (Load Sensing Pressure Regulating Valve) in the
brake circuit. Hence it is imperative that the
the vehicle on a
disturbing the LSPV settings, leading to different braking characteristics.
Ensure to re‐connect the LSPV spring and measure the fitted length after lowering the
vehicle from the 2‐post lift.
© 2011 Mahindra & Mahindra Ltd. All rights reserved. This book may not be reproduced or copied, in whole or in part, without
the written permission of Mahindra & Mahindra Ltd.
2‐post
lift. Failure to do so can lead to elongation of the spring,
LSPV spring is
disconnected before lifting
Need help?
Do you have a question about the Genio DC BS-IV and is the answer not in the manual?