Environmental Requirements; Power Requirements; Digital System Pre-Installation Information - Planmeca ProOne Installation Manual

Hide thumbs Also See for ProOne:
Table of Contents

Advertisement

2.2

Environmental requirements

NOTE The X-ray unit must be installed in a location where the user can freely monitor the
2.2.1
Wall strength
2.2.2
Temperature & Humidity
NOTE If the X-ray unit has been stored at temperatures below +10°C for more than a few
2.3

Power requirements

CAUTION Never connect the X-ray unit to the mains without first checking the
2.4

Digital system pre-installation information

NOTE The PC and other equipment connected to the system must be:
2.4.1
Client PC system requirements
Installation Manual
Printed copies of this document are considered uncontrolled.
7535.13.Rev001
08.07.2018
WARNING
FAILURE TO INSTALL THE X-RAY UNIT IN AN APPROVED
LOCATION MAY BE DANGEROUS TO BOTH PATIENT AND
OPERATOR.
patient during the whole imaging process. For minimum operational space
requirements, see section 2.5 "Dimensions for X-ray unit" on page 6.
The Planmeca ProOne X-ray unit must be attached to the wall prior use. Make sure that
the wall will support the X-ray unit. The wall bracket installation must be able to resist a
pull-out force of 2759 N (276 kg, 608 lb).
The operating temperature range is from +10°C to +40°C, non condensing. The
acceptable humidity range is from 15% to 85%. The transport and storage temperature
range is from 0°C to +50°C.
hours, time must be allowed for the unit to reach room temperature before
connecting it to the mains voltage.
Make sure that the power requirements of the X-ray unit are the same as the power that is
to be used. The X-ray unit is designed to operate using 100-240V~ universal power
supply. The power requirements are printed on a label which is attached to the mains
cable. They are also printed on the label located on the back of the moving column. If the
voltage is likely to fluctuate below 90V or over 264V you will need to install a UPS
(Uninterruptible Power Supply) between the mains supply and the X-ray unit to ensure
correct operation. The mains frequency can be either 50 or 60 Hz.
Make sure that there is a dedicated, grounded power outlet within 2.5 meters (8 feet) of
where the X-ray unit is to be installed.
voltage setting. Incorrect voltage setting can cause damage to the
unit electronics.
The digital system consists of a Planmeca ProOne X-ray unit, Ethernet card, one or more
PCs and a Dimaxis/Romexis software package.
- approved by local authorities: e.g. IEC-approved (CE marked), UL / CSA approved
- located outside the patient area (more than 2m (79 in.) from the X-ray unit) and
- protectively grounded.
Operating system
Windows XP, Windows 2000, Windows NT 4.0, Windows ME or Windows 98
PRE-INSTALLATION INFORMATION
Planmeca ProOne 3