12. Connect any conveyors into the seed treater
control panel. Ensure that the conveyors
being used are the same power ratings as the
seed treater.
The starters and overloads
located in the seed treater panel
are rated for 5 HP motors. Do
NOT plug any conveyor into the
seed treater that exceeds 5 HP.
13. Have a certified electrician provide power to
the seed treating system. Provide convenient
shutdown switches and comply with local
electrical codes. The USC system must be
connected to the same electrical requirements
as specified in the main control panel on the
power requirement tag (right), or the electrical
schematic shipped with the piece of
equipment. This will power the USC system
except the seed wheel.
Control panel bracket is hinged
to allow access to the atomizer
chamber. Flexible conduit is
recommended for main power
supply .
14. Connect the Seed Wheel to a 120 volt power
source.
15. Open the adjustable seed gate to its most
wide open position. If the seed gate is not
open fully, seed flow will be diminished and
may even back up into the seed wheel.
16. Reverse the previous steps when removing
the machine from its working position.
Page 16
LP2000 with Seed Wheel
USC,
LLC
Power Requirements Tag
Incoming Power Connected To
These Terminals

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents