Assembly Steps - Ametek Surgex UPS-17202-53R User Manual

Online battery backup, 2000/3000 va
Hide thumbs Also See for Surgex UPS-17202-53R:
Table of Contents

Advertisement

_________________________________________________________________
first and as low as possible. Start with the lowest available position
and work up. Your UPS should be installed last and end up on the top of
all the battery cabinets for proper cable routing.
Use all supplied mounting hardware on each UPS and external battery
cabinet. NEVER depend on lower devices to support other devices.
Included in each rack mount carton is a rail kit. The rail kit consists of
the following components :

3.2.1 Assembly Steps

Step 1: Use four M6 screws to mount the right and left rail sliders to
the two front posts of the four-post rack. Refer to the following
figure:
Step 2. Use four M6 screws to mount the right and left rail sliders to
the two back posts of the four-post rack. Refer to the following
figure:
© 2019 AMETEK Electronic Systems Protection / Technical Support: 1-800-645-9721 / surgex.com
Attention
User Manual
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Surgex ups-17302-60r

Table of Contents