Commissioning
7.1
Requirements
Before commissioning starts, the system components must be installed and wired up.
The following is necessary:
● A SIMATIC S7 CPU / SIMOTION with PROFINET/PROFIBUS interface
● A SIPLUS HCS4300 heating control system, comprising one central interface module
(CIM) and at least one power output module (POM).
7.2
Commissioning
Procedure
1. Switch on the 24 V DC power supply.
2. Switch on the three-phase power supply for the heating control system.
The components CIM, POM and PM, if installed, of the heating control system start up.
Observe the operating mode indicators (see section Process and system messages,
error handling (Page 145)).
The heating control system is in operation.
SIPLUS HCS4300 PROFINET/PROFIBUS DP
Operating Instructions, 10/2019, A5E35452705A/005
7
81