Ametek Chandler Engineering 1910 Instruction Manual page 42

Pressurized curing chamber
Table of Contents

Advertisement

1
6
6
D
9
9
C
B
A
1
2
3
5
2
3
4
8
7
2X
B
1
ITEM
1
2
3
4
5
6
2
7
8
3
9
BREAK EDGES, DEBURR
THIS DOCUMENT AND THE DRAWINGS AND
4
TECHNICAL DATA CONTAINED HEREON ARE THE
UON DIMS ARE IN INCHES
PROPERTY OF CHANDLER ENGINEERING COMPANY
LLC. REPRODUCTION OR DISSEMINATION IN ANY
1 PLC
0.030
FORM EXCEPT AS EXPRESSLY AUTHORIZED BY THE
3 PLC
0.005
OWNER IS FORBIDDEN. THE HOLDER AGREES TO
SURFACE FINISH 63 RMS
RETURN THE DOCUMENT TO THE OWNER ON
DEMAND. COPYRIGHT BY CHANDLER ENGINEERING
THIRD ANGLE PROJECTION
COMPANY LLC
4
5
REV
DESCRIPTION
A
ISSUED
B
ECN T8255; CHANGED QTY OF C18018 TO 2
PART NUMBER
DESCRIPTION
19-0113-CE
RESERVOIR ASSEMBLY
P-1496
ELBOW,BR,1/4FPX1/4MP,STREET,90DEG
36-0040
ADAPTER, GAUGE
P-1500
VALVE,NDL,BR,1/4MX1/4M,2WY-STR
P-0275
PLUG,BR,1/2MP,HEX
19-0119
DIP TUBE,RESERVOIR,3/8
C18018
PLUG,SIGHT GLASS,3/4-IN NPT
C18020
VALVE,RELIEF,SS,81-150 PSI
P-1255
ELBOW,BRS,1/4MPX1/4T,SW
CHANDLER ENGINEERING
DRAWN: JJM
8/3/2018
MFG: ADMN
8/13/2018
2 PLC
0.010
ENGR: JJM
8/3/2018
ANGL
1/2
TYPE:
PN: 19-0120-CE
STRUCT:
PROJ: 19
5
6
DATE
APPROVED
07/23/18
JJM
8/28/2018
JJM
D
C
B
QTY
UoM
1
EA
1
EA
1
EA
1
EA
1
EA
2
EA
2
EA
A
1
EA
3
EA
RESERVOIR ASSEMBLY,OIL
REV B
SIZE B
SHEET 1 OF 1
6
TITLE BLOCK REV 3

Advertisement

Table of Contents
loading

Table of Contents