Ametek Chandler Engineering 1910 Instruction Manual page 34

Pressurized curing chamber
Table of Contents

Advertisement

1
2
H
CHAMBER PRESSURE GAGE
G
OVERTEMP CONTROLLER
CHAMBER THERMOCOUPLE CONNECTION
F
E
D
C
B
A
1
2
3
4
5
TOUCHSCREEN INSTUMENT CONTROLLER
HEATER INDICATOR
PRESSURE RELEASE VALVE
HEATER SWITCH
POWER SWITCH
DETAIL A
A
3
4
5
6
7
8
AIR INLET
RUPTURE DISK
DISCHARGE PORT
8
6
7
9
10
11
REV
A
B
ECN T8589; ADDED INPUTS/OUTPUTS
SERIAL COMM PORT
LAN PORT
USB PORT
MAINS POWER RECEPTICLE
ITEM
PART NUMBER
1
19-0090-CE
MODEL 1910,CURING CHAMBER,CE
2
1910-CE-ACCESS
ACCESSORIES,MODEL 1910-CE
3
1910-CE-SHIP
SHIPPING LIST,1910-CE
4
1910-CE-INSP
FINAL INSPECTION CHECKLIST, 1910-CE
5
19-0175-CE
MANUAL,1910 CURING CHAMBER
6
1910-CE-TEST
PROC,TEST,CURING CHAMBER
BREAK EDGES, DEBURR
DRAWN: JJM
8/6/2018
THIS DOCUMENT AND THE DRAWINGS AND
TECHNICAL DATA CONTAINED HEREON ARE THE
UON DIMS ARE IN INCHES
MFG: ADMN
8/14/2018
PROPERTY OF CHANDLER ENGINEERING COMPANY
LLC. REPRODUCTION OR DISSEMINATION IN ANY
1 PLC
0.030
2 PLC
0.010
ENGR: JJM
8/6/2018
FORM EXCEPT AS EXPRESSLY AUTHORIZED BY THE
3 PLC
0.005
ANGL
1/2
OWNER IS FORBIDDEN. THE HOLDER AGREES TO
TYPE:
RETURN THE DOCUMENT TO THE OWNER ON
SURFACE FINISH 63 RMS
DEMAND. COPYRIGHT BY CHANDLER ENGINEERING
STRUCT:
THIRD ANGLE PROJECTION
COMPANY LLC
9
10
11
12
DESCRIPTION
DATE
APPROVED
ISSUED
08/02/18
JJM
7/3/2019
JJM
H
G
F
E
D
C
B
DESCRIPTION
QTY
UoM
1
EA
1
EA
1
EA
A
1
EA
1
EA
1
EA
CHANDLER ENGINEERING
MODEL 1910-CE CURING CHAMBER
PN: 1910-CE
REV B
SIZE D
PROJ: 1910
SHEET 1 OF 1
12
TITLE BLOCK REV 3

Advertisement

Table of Contents
loading

Table of Contents