Ametek Chandler Engineering 1910 Instruction Manual page 36

Pressurized curing chamber
Table of Contents

Advertisement

1
2
H
G
58
F
E
D
C
B
A
1
2
3
4
5
3
4
5
6
7
8
37
2X
38
2X
39
BACK PANEL NOT SHOWN
8
6
7
9
10
11
18
2
BREAK EDGES, DEBURR
DRAWN: JJM
8/6/2018
THIS DOCUMENT AND THE DRAWINGS AND
TECHNICAL DATA CONTAINED HEREON ARE THE
UON DIMS ARE IN INCHES
MFG: ADMN
8/14/2018
PROPERTY OF CHANDLER ENGINEERING COMPANY
LLC. REPRODUCTION OR DISSEMINATION IN ANY
1 PLC
0.030
2 PLC
0.010
ENGR: JJM
8/6/2018
FORM EXCEPT AS EXPRESSLY AUTHORIZED BY THE
3 PLC
0.005
ANGL
1/2
OWNER IS FORBIDDEN. THE HOLDER AGREES TO
TYPE:
RETURN THE DOCUMENT TO THE OWNER ON
SURFACE FINISH 63 RMS
DEMAND. COPYRIGHT BY CHANDLER ENGINEERING
STRUCT:
THIRD ANGLE PROJECTION
COMPANY LLC
9
10
11
12
H
G
F
E
D
C
B
A
CHANDLER ENGINEERING
MODEL 1910,CURING CHAMBER,CE
PN: 19-0090-CE
REV F
SIZE D
PROJ: 19
SHEET 2 OF 2
12
TITLE BLOCK REV 3

Advertisement

Table of Contents
loading

Table of Contents