Chapter 4: Installing The Server And Peripheral Devices; In This Chapter; Installing The Server; To Install The Server - Avaya CallPilot 600r Hardware Installation

Hide thumbs Also See for CallPilot 600r:
Table of Contents

Advertisement

Chapter 4: Installing the server and

In this chapter

Installing the server

Connecting peripherals to the server
Connecting the server to the ELAN subnet
Connecting the server to the Avaya server subnet (optional)
Installing the Avaya software feature dongle
Installing the server
Before you install the 600r server, ensure that the chosen location meets the requirements
identified in the Site inspection checklist provided in the Installation and Configuration Task
List (NN44200-306).
Note:
The 600r server is supplied with industry standard 48.3 cm (19 in.) rack rails that can
accommodate racks with a maximum depth of 61 cm (24 in.) between the mounting posts.
Check the rack you are using and ensure that the Avaya supplied server rack rails are
suitable for your specific installation requirements. For depths greater than 61 cm (24 in.),
Avaya recommends that you purchase a third-party rack shelf that can safely hold up to
23 kg (50 lb.)

To install the server

1. Place the 600r server in its chosen location. If you are installing the server in a rack
Avaya CallPilot® 600r Server Hardware Installation
peripheral devices
on page 29
cabinet, follow the instructions provided with the slide rails.
on page 30
on page 34
on page 37
on page 35
December 2010
29