3. Installation

3.1 Packing Inspection
•Check packing conditions carefully, before unpacking.
•Contact Hani lScientific Inc. immediately if damages found.
•Check the delivery for completeness.
•You can get contact details on packing boxes and the back of the manual.
3.2 Installation
3.2.1 Selecting the location
Installation on hard and flat ground.
• Centrifuge should be installed on hard and flat place.
• If the centrifuge is installed in an inclined place, the shaft may be bent due to the
weight of the rotor.
Goodventailation.
• For air circulation and safety, maintain a 30cm"clearance envelope"around the
centrifuge while the rotor is spinning.
Constant temperature/humidity
• Centrifuge equipped with the sensitive electronic software which is fragile with
humidity and temperature.
•Must avoid direct ray or heater and be put in the ambience of controlled temp.and air.
Avoid the corrosive gas
• Install the centrifuge in a place where corrosive gas is not generated.
• Sulfur dioxide gas and chlorine gas may cause corrosion.
Leveling
• The shaft should be put exactly vertical on the hotizontaliy flat ground by
the leveling tool