Danfoss VLT Automation Drive FC 300 Operating Instructions Manual page 43

Hide thumbs Also See for VLT Automation Drive FC 300:
Table of Contents

Advertisement

®
VLT
Automation Drive FC 300
Operating Instructions High Power
Illustration 3.57: Installation of bottom duct
Install the front cover of the duct and the ca-
ble clamp base if used. Install the two remain-
ing gland plates.
MG.33.U1.02 - VLT
®
is a registered Danfoss trademark
After the bottom ductwork has been posi-
tioned in place, remove the three T25 screws
from the outer holes in the mounting brackets
on the sides and front of ductwork and move
them to the inner holes of the same brackets.
Tighten the three screws to the specified tor-
que. The bottom duct work is not fastened to
Rittal enclosure.
Illustration 3.58: Move mounting screws from the
outer hole to the inner hole
Illustration 3.59: Bottom duct installed.
3. How to Install
3
43

Advertisement

Table of Contents
loading

Table of Contents