Step 3. Install The Analyzer - Keysight Technologies PNA Series Installation And Getting Started Manual

Network analyzers
Hide thumbs Also See for PNA Series:
Table of Contents

Advertisement

In This Guide
Installing Your Analyzer
Figure 3
Protective Earth Ground (Non-Floating)
3. Ensure the operating environment meets the requirements found in
Some analyzer performance parameters are specified for 25°C. Refer to
the Help system in the analyzer for the complete specifications.

Step 3. Install the Analyzer

Please review all safety information located in
Environmental Information" on page 31
installing and using the analyzer
The analyzer can be installed on a bench top or in an equipment rack. When
installing an analyzer equipped with handles in an equipment rack, use Option
1CP. When installing an analyzer not equipped with handles in an equipment
rack, use Option 1CM.
14
"Safety, Regulatory, and Environmental Information" on page 31.
"Safety, Regulatory, and
, before proceeding with
Installation Note E8356-90001

Advertisement

Table of Contents
loading

Table of Contents