Tektronix Keithley SourceMeter 2470 Reference Manual page 356

High voltage instrument
Hide thumbs Also See for Keithley SourceMeter 2470:
Table of Contents

Advertisement

Section 9: TSP-Link and TSP-Net
Item
Description
1
Controller
2
Communication connection
3
Nodes
4
LAN crossover cable
5
TSP-Link connections
9-2
2470 High Voltage SourceMeter Instrument Reference Manual
Figure 133: TSP-Link connections
Notes
Optional. A computer is not needed for stand-alone
systems.
Optional. Connection from controller to the master
node through GPIB, LAN, or USB. Details about
these computer communication connections are
described in
Remote communications interfaces
page 2-9).
You can have up to 32 nodes on the TSP-Link
system. Each node must have a unique node
number from 1 to 63.
Type 5e category or higher; 3 meters (9.8 feet)
maximum between nodes.
Each instrument has two TSP-Link connectors. You
can make the connection to either TSP-Link
connection.
(on
2470-901-01 Rev. A / May 2019

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Keithley SourceMeter 2470 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF