Operation
8
Operation
8.1
Installation inspection
In order to ensure the unit is installed correctly, the following points should be checked:
Ensure the power supply corresponds to the correct connection values and suitable fuses have been
•
used.
Has the mechanical and electrical installation been performed correctly and completely?
•
Check the mechanical and electrical installation for completeness and the correct input voltages.
•
Ensure that the optical components are free from dust and dirt.
•
Have the protective covers been removed from the focusing objective lens?
•
Check the environmental conditions against the technical specification.
•
Are you familiar with the laser safety regulations?
•
Have all laser safety measured been fulfilled?
•
The system may then only be switched on once all provisions for complying with laser safety have been
checked by an authorized individual and confirmed to have met the standards.
8.2
Marking software
The marking software is included on the accompanying software CD.
For information on using the software, please read the accompanying software manual.
44
ENGLISH (Translation)
Need help?
Do you have a question about the ProMarker OEM and is the answer not in the manual?
Questions and answers