Overhaul Parts - Mitsubishi Electric CR800-D Series User Manual

Industrial robot, controller, predictive maintenance function
Hide thumbs Also See for CR800-D Series:
Table of Contents

Advertisement

(2) Timing belt
Error number
Error message
RT ToolBox3 predictive
maintenance message
Measures
Error number
Error message
RT ToolBox3 predictive
maintenance message
Measures

10.1.2. Overhaul parts

(1) Reduction gear
Error number
Error message
RT ToolBox3 predictive
maintenance message
Measures
Error number
Error message
RT ToolBox3 predictive
maintenance message
Measures
C.713n
Timing belt replacement period
The timing belt (Jn axis) consumption degree exceeded the warning number of
days remaining. Please check the details and prepare for timing belt replacement.
Replace the timing belt. After that, reset the consumption degree.
For details of the timing belt and replacement procedure, refer to "5. Maintenance and
Inspection" in the separate volume, "Instruction Manual/Robot Arm Setup &
Maintenance".
For reset method, refer to "11.2 Maintenance Reset"..
C.713n
Timing belt replacement period
The timing belt (Jn axis) consumption degree exceeded 100%.
Timing belt replacement is recommended.
Replace the timing belt. After that, reset the consumption degree.
For details of the timing belt and replacement procedure, refer to "5. Maintenance and
Inspection" in the separate volume, "Instruction Manual/Robot Arm Setup &
Maintenance".
For reset method, refer to "11.2 Maintenance Reset".
C.714n
Overhaul period (decelerator)
The gear (Jn axis) consumption degree exceeded the warning number of days
remaining. Please check the details and prepare for overhaul.
Perform overhaul of the robot body.
For selection of replacement parts and overhaul implementation timing, consult with
our service affiliated company.
When overhaul is performed, perform reset.
For reset method, refer to "11.2 Maintenance Reset".
C.714n
Overhaul period (decelerator)
The gear (Jn axis) consumption degree exceeded 100%.
Overhaul is recommended.
Perform overhaul of the robot body.
For selection of replacement parts and overhaul implementation timing, consult with
our service affiliated company.
After overhaul, perform reset.
For reset method, refer to "11.2 Maintenance Reset".
(* n in the table indicates the axis numbers (1 to 6).
When consumption occurred/abnormality detected 75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr800-r seriesCr800-q series

Table of Contents