Mitsubishi Electric MELSEC iQ-R Series User Manual page 112

Energy measuring module
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

Section 6 SETTING AND PROCEDURE FOR OPERATION
(2)
Connecting 5 A current sensor and extension cable (separate)
(a) Remove the connectors.
(b) Connecting the extension cable.
Supplement
Cable extension for EMU2-CT5 is 10 m max. (Total cable length is 11m max.)
Use extension cable (separate) when 1-phase and 3-phase are set apart.
6.3.5
Voltage circuit connection
If a 220 V or higher circuit is used, use a transformer.
The transformer which has primary voltage of VT less than 6600V and secondary voltage of VT not more than
220V can be used. For connection to P1 to P3 terminals on RE81WH, connect the secondary of transformer.
Make sure that terminal symbols are correct.
In order to perform maintenance work such as changing the wire layout and replacing equipment, we
recommend that you connect protective device (breaker) for the voltage input circuit (P1, P2, and P3 terminals).
Breaker
P2
EMU2-CT5(0.5m)
EMU2-CB-T**MS (1 to 10m)
P1
P3
111
RE81WH
EMU2-CB-Q5A (0.5m)

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Melsec re81wh

Table of Contents