Power Source Connections - ESAB m3 G2 System Manual

Plasma system
Table of Contents

Advertisement

section 4
4.1

power source connections

1. To make the power supply connection to the RAS box, you must first open the unit: remove or unlock the
cover screws and lift the box cover off to expose internal components.
caution
2. To attach the Pilot Arc and Power cables to the RAS box, you must pass them through the strain relief fit-
tings.
Strain Relief Fittings
the cover is grounded to the remote arc starter Box internally
with a short ground wire. remove cover carefully to avoid dam-
age to the wire or loosening of the ground wire.
remote arc starter Box
Pilot Arc Cable
39
Power Source Cables

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents