5 - Operation
BoomPrime
The BoomPrime system works automatically, and it is activated, when a spray job is prepared:
1. Turn on the PTO.
2. Set pressure valve to "Spraying", suction valve to "Main tank" and
agitation valve to "Agitation", if needed.
3. Adjust the spray pressure to what will be used when spraying.
4. The boom will then be fully primed within 1-2 minutes.
If the nozzles start to drip, when closing one or more boom sections
during a spray job, proceed as follows:
1. Adjust the pressure on the BoomPrime pressure regulation.
2. Turn pressure valve to "Main tank".
3. Disconnect the PTO.
If adjustment of the BoomPrime system might be necessary, please refer
to the section "BoomPrime Adjustment" on page 96.
106