Siemens SINAMICS GL150 Operating And Installation Instructions page 7

Medium-voltage drive
Table of Contents

Advertisement

4.4
Transportation........................................................................................................................58
4.4.1
Transport markings................................................................................................................58
4.4.2
Transport requirements..........................................................................................................58
4.4.3
Observe center of gravity.......................................................................................................59
4.4.4
Transport with a fork-lift truck.................................................................................................59
4.4.5
Transport with a crane...........................................................................................................60
4.4.6
Using lifting rods.....................................................................................................................60
4.4.7
Transporting transportation units packed in boxes................................................................62
4.5
Unpacking..............................................................................................................................63
4.5.1
Removing the packaging........................................................................................................63
4.5.2
Removing load securing devices...........................................................................................64
4.5.3
Lifting the cabinet off the transport pallet...............................................................................64
4.5.4
Opening doors in preparation for use.....................................................................................65
4.5.5
Checking the shock and tilt indicators inside the cabinet.......................................................65
4.6
Storage...................................................................................................................................66
4.6.1
Storing a device.....................................................................................................................66
4.6.2
Storing fans............................................................................................................................67
5
Mounting.....................................................................................................................................................69
5.1
Tools required........................................................................................................................70
5.2
Screwing the transport units together....................................................................................70
5.3
Connect to the foundation......................................................................................................71
5.4
Mounting fans.........................................................................................................................72
5.5
Ensuring cooling air................................................................................................................72
6
Electrical connection...................................................................................................................................73
6.1
Electromagnetic compatibility.................................................................................................75
6.2
Potential concept....................................................................................................................78
6.3
Connecting equipotential-bonding conductors.......................................................................78
6.4
Using the equipotential bonding strip and shield bus.............................................................79
6.5
Connecting the protective grounding.....................................................................................79
6.6
Laying the signal lines............................................................................................................80
6.7
Laying the cable shields.........................................................................................................80
6.8
Separating adjacent cabinets using unsuppressed contactors..............................................81
6.9
Laying additional wiring..........................................................................................................81
6.10
Connecting the power unit.....................................................................................................81
6.10.1
Connecting power cables.......................................................................................................81
6.10.2
Connecting the signal cables.................................................................................................83
6.11
Connecting the closed-loop control........................................................................................84
6.11.1
Connecting ground.................................................................................................................84
6.11.2
Connecting the auxiliary voltage............................................................................................84
6.11.3
Connecting circuit breakers....................................................................................................84
6.11.4
Connecting the external safety loop.......................................................................................85
SINAMICS GL150 6SL38503UM114PA0Z
Operating Instructions 04/2017
Table of contents
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents