Siemens SINAMICS GL150 Operating And Installation Instructions page 6

Medium-voltage drive
Table of Contents

Advertisement

Table of contents
3.3.3.1
Fuseless technology..............................................................................................................35
3.3.3.2
Thyristor electronics...............................................................................................................36
3.3.3.3
Voltage actual value sensing.................................................................................................37
3.3.3.4
Ground fault detection............................................................................................................38
3.4
Closed-loop control................................................................................................................40
3.4.1
Structure of the open and closed loop control plate...............................................................40
3.4.2
Mushroom pushbutton...........................................................................................................40
3.4.3
Description of the components...............................................................................................41
3.4.3.1
SINAMICS Control Unit..........................................................................................................41
3.4.3.2
DRIVE-CLiQ interface............................................................................................................41
3.4.3.3
Voltage Sensing Module........................................................................................................41
3.4.3.4
Power supply unit...................................................................................................................42
3.4.3.5
Customer terminal strips........................................................................................................42
3.5
Options...................................................................................................................................42
3.5.1
Internal synchronizing voltage detection (option A11)...........................................................42
3.5.2
Damping switch for 1.4 kV (option C50).................................................................................42
3.5.3
Duty cycle (option C61)..........................................................................................................43
3.5.4
Black start (option E05)..........................................................................................................43
3.5.5
Brake after phase shifter operation (option E08)...................................................................43
3.5.6
3.5.7
Temperature evaluation of the MV transformer (option K63).................................................45
3.5.8
Control Unit CU320-2 PN (option K95)..................................................................................45
3.5.9
Inductive cable attenuation (option L05)................................................................................45
3.5.10
3.5.11
L58)........................................................................................................................................46
3.5.12
Dust protection (option M11)..................................................................................................46
3.5.13
Lock barrel (option M40)........................................................................................................47
3.5.14
Degree of protection IP41 (option M41).................................................................................47
3.5.15
Separate installation (M49)....................................................................................................47
3.5.16
Low-noise fan (option M65)....................................................................................................47
3.5.17
Customer-specific door stop for control cabinets (option M76)..............................................47
3.5.18
Line-side surge arresters (option N54)...................................................................................47
3.5.19
Machine-side surge arresters (option N56)............................................................................47
3.5.20
Line-side fuses (option N58)..................................................................................................48
3.5.21
Cabinet lighting in the power unit (option N86)......................................................................48
3.5.22
Customized locking system (option Y41)...............................................................................48
3.5.23
Customized duty cycle (option Y45).......................................................................................48
4
Preparations for use...................................................................................................................................49
4.1
Notes for system integrators..................................................................................................49
4.1.1
Requirements for transformers..............................................................................................49
4.1.2
Selection and configuration of multi-winding transformers.....................................................50
4.1.3
Requirements for the circuit breaker provided by the customer.............................................51
4.1.4
Requirements for cables........................................................................................................54
4.2
Requirements for installation location....................................................................................55
4.3
Inspections when receiving the delivery.................................................................................56
4.3.1
Checking the delivery.............................................................................................................56
4.3.2
Checking shock and tilt indicators..........................................................................................56
4.3.3
Checking the load handling attachments...............................................................................57
6
SINAMICS GL150 6SL38503UM114PA0Z
Operating Instructions 04/2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents